What we make
About us
About us
The people and the machines behind the parts.

Our promise
We cut metal to the micron, not the nearest guess
Every Lathe part is measured against its drawing before it leaves, and the report travels with the parts.

Milled flanges, checked against the drawing
Our team
The hands behind Lathe
Machinists, a quality engineer and a planner who answer your drawing questions by name.
Reviews
What buyers say about Lathe
Pump makers, packaging lines and machine builders who send us their drawings every month.
Rated 5 out of 5Pump shafts
“Lathe turns our pump shafts to the drawing every time. The first batch passed inspection and the next eleven did too.”
Rated 5 out of 5Prototype run
“We sent a rough sketch on Monday and had three milled housings on the bench by Friday, with a full measurement report.”
Rated 4.8 out of 5Spare parts
“When a gear failed on our line, they made a new one from the worn part overnight. We lost one shift, not one week.”
Rated 5 out of 5Long-term supplier
“Six years of flanges and bushes, always on the agreed day. Their engineer calls before a problem reaches us.”
Events
Come and see the machines run
Open days at the Lathe shop, a stand at the regional trade fair and an online talk for buyers.
- 14MAR · Fri
: Open day at the shop
10:00 – 16:00 · Lathe shop, Unit 4
Walk the shop floor, watch the CNC lathes run and bring a drawing to talk through.
- 27MAR · Thu
: Drawings that price fast
11:00 – 12:00 · Online
A short talk on the notes and tolerances that help a shop quote your part quickly.
- 9–11APR
to : Regional engineering fair
09:30 – 18:00 · Exhibition hall, stand 12
Meet our engineers and see sample parts from turning, milling and fabrication.
- 24APR · Thu
: Shop tour for students
14:00 – 16:00 · Lathe shop, Unit 4
A guided tour for engineering students, from the drawing desk to the inspection room.
New dates are on their way. Check back soon, or write to us and we will let you know.
Shop notes
What we learn at the machine
Short notes from the Lathe floor on drawings, materials and finishes, written by the people who cut the parts.

14 Oct 2026Drawings5 min read
Five marks every drawing should carry
Material, finish, tolerance, quantity and the faces that matter: what we look for first on a new drawing.
Read
2 Oct 2026Fabrication4 min read
Why we roll thin sheet before welding
Rolling first keeps the seam straight and the bore round, so the duct bolts up at site without forcing.
Read
19 Sep 2026Finishing6 min read
Turned, ground or lapped: pick a finish
How each finish feels, what it costs in time and where paying for a finer surface really pays back.
Read
3 Sep 2026Milling3 min read
Milling copper without the burrs
Sharp cutters, light passes and plenty of coolant: how we keep soft copper electrodes clean and true.
ReadShop notes
Notes from the Lathe shop floor
New machines, material tips and lead times for the month ahead, written by our engineers.
Thank you — the next note is on its way.
Ordering terms
Quotes, first pieces and delivery terms
Last updated 1 November 2026. Questions about an order? Call the works and ask for the planning desk.
Lathe makes turned, milled and fabricated parts to your drawing, from single prototypes to repeat batches. This page explains how a quote becomes an order and what happens before your parts leave the works.
Quotes
- A quote is valid for thirty days from the date on it
- Prices include the material, machining and our inspection
- Plating, heat treatment and special packing are quoted on their own line
First pieces
For a new part we make one piece and check it on the gauges before the batch runs. You can ask for it to be sent to you for approval, which adds about three working days.
Delivery and changes
We deliver across the region in our own van and ship further by courier. A drawing change after the material is cut is quoted again before we carry on.